<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE ArticleSet PUBLIC "-//NLM//DTD PubMed 2.7//EN" "https://dtd.nlm.nih.gov/ncbi/pubmed/in/PubMed.dtd">
<ArticleSet>
<Article>
<Journal>
				<PublisherName>University of Tehran Press</PublisherName>
				<JournalTitle>Iranian Journal of Biosystem Engineering</JournalTitle>
				<Issn>2008-4803</Issn>
				<Volume>45</Volume>
				<Issue>1</Issue>
				<PubDate PubStatus="epublish">
					<Year>2014</Year>
					<Month>05</Month>
					<Day>22</Day>
				</PubDate>
			</Journal>
<ArticleTitle>Planning and Scheduling Barley Production Mechanization Project Using the PERT Network: Case Study Alborz Province</ArticleTitle>
<VernacularTitle>Planning and Scheduling Barley Production Mechanization Project Using the PERT Network: Case Study Alborz Province</VernacularTitle>
			<FirstPage>11</FirstPage>
			<LastPage>22</LastPage>
			<ELocationID EIdType="pii">51286</ELocationID>
			
<ELocationID EIdType="doi">10.22059/ijbse.2014.51286</ELocationID>
			
			<Language>FA</Language>
<AuthorList>
<Author>
					<FirstName>Mohammad</FirstName>
					<LastName>Sharifi</LastName>
<Affiliation>University Of Tehran</Affiliation>
<Identifier Source="ORCID">0000-0003-4594-4972</Identifier>

</Author>
<Author>
					<FirstName>Asadollah</FirstName>
					<LastName>Akram</LastName>
<Affiliation>Associate Professor in Department of Agricultural Machinery Engineering</Affiliation>
<Identifier Source="ORCID">0000-0002-0835-0975</Identifier>

</Author>
<Author>
					<FirstName>Shahin</FirstName>
					<LastName>Rafiee</LastName>
<Affiliation>Professor in Department of Agricultural Machinery Engineering</Affiliation>
<Identifier Source="ORCID">0000-0003-2647-3984</Identifier>

</Author>
<Author>
					<FirstName>Majid</FirstName>
					<LastName>Sabzehparvar</LastName>
<Affiliation>Ph.D. in the field of Industrial Engineering from Iran University of Science &amp;amp; Technology</Affiliation>

</Author>
</AuthorList>
				<PublicationType>Journal Article</PublicationType>
			<History>
				<PubDate PubStatus="received">
					<Year>2012</Year>
					<Month>11</Month>
					<Day>14</Day>
				</PubDate>
			</History>
		    <Abstract>Agricultural mechanization project must be identified in a short time frame to do a certain way; otherwise, cost is not the time to come and will also result in reduced yield. To avoid these costs in farming systems is necessary in any region that agricultural mechanization projects are and scheduling and planning as well as scientific until activities included in the project to fruition are done in the correct order and at the right time. Nature of agricultural projects - with its perform certain activities in a series of times - the closer PERT network is a network technology so PERT networks were used for planning and scheduling production mechanization barley at Alborz province. Barley for mechanized production data required by researchers from the fields of observation and questionnaire were collected by farmers. Project work break down structure diagram has been determined and it was drawn. PERT networks in the project were drawn and analyzed. The shortest time possible mechanized barley production is 228.20 days. likely to reach 99% of the product mechanized barley project completed in less than 240 days. with likely 95%, product barley project lasts 231.45 days.</Abstract>
			<OtherAbstract Language="FA">Agricultural mechanization project must be identified in a short time frame to do a certain way; otherwise, cost is not the time to come and will also result in reduced yield. To avoid these costs in farming systems is necessary in any region that agricultural mechanization projects are and scheduling and planning as well as scientific until activities included in the project to fruition are done in the correct order and at the right time. Nature of agricultural projects - with its perform certain activities in a series of times - the closer PERT network is a network technology so PERT networks were used for planning and scheduling production mechanization barley at Alborz province. Barley for mechanized production data required by researchers from the fields of observation and questionnaire were collected by farmers. Project work break down structure diagram has been determined and it was drawn. PERT networks in the project were drawn and analyzed. The shortest time possible mechanized barley production is 228.20 days. likely to reach 99% of the product mechanized barley project completed in less than 240 days. with likely 95%, product barley project lasts 231.45 days.</OtherAbstract>
		<ObjectList>
			<Object Type="keyword">
			<Param Name="value">PERT network</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Planning and scheduling</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Agriculture mechanization</Param>
			</Object>
			<Object Type="keyword">
			<Param Name="value">Alborz Province</Param>
			</Object>
		</ObjectList>
<ArchiveCopySource DocType="pdf">https://ijbse.ut.ac.ir/article_51286_1d23f469df0023f2b380208e9642445b.pdf</ArchiveCopySource>
</Article>
</ArticleSet>