Time-Cost-Quality Optimization of Broilers Production Process Using Integration Genetic Algorithm and Fuzzy Logic

Document Type : Research Paper

Authors

1 M.Sc. Student in the field of Agriculture Mechanization, Department of Agricultural Machinery Engineering, Faculty of Agricultural Engineering & Technology, University College of Agriculture & Natural Resources, University of Tehran, Karaj, Iran

2 Assistant Professor in Department of Agricultural Machinery Engineering, Faculty of Agricultural Engineering & Technology, University College of Agriculture & Natural Resources, University of Tehran, Karaj, Iran

3 Professor in Department of Agricultural Machinery Engineering, Faculty of Agricultural Engineering & Technology, University College of Agriculture & Natural Resources, University of Tehran, Karaj, Iran

4 M.Sc. Student in the field of Animal Physiology, Department of Animal Science, Faculty of Agricultural Engineering & Science, University College of Agriculture & Natural Resources, University of Tehran, Karaj, Iran

Abstract

One of the most important issues in the management of production is select the best option for each production activity, So that the time and cost of production is minimal and quality is the maximum. Considering to the large number of activities and options for each activity, usually, this choice does not have a unique solution and can be used the utility function and assign weights to time, cost and quality, Select the best answer from the answers obtained. Since there is uncertainty in the real world, so to achieve a careful management must consider the uncertainty. In this paper, a fuzzy mathematical model for a network of activities is recommended. Until among the possible methods, best method for each activity to be determined. For this purpose, a genetic algorithm based on non-dominated ranking was used for solving the problem. And best method presented for each activity in the production of broiler from Buy eggs broiler breeder hen until slaughter house and the amount of time, cost and quality was calculated, 1793.8 hour and 9119.9 million Rials and 48% respectively.

Keywords

Main Subjects


Abdel Razek, R.H., Diab, A.M., Hafez, S.M., Aziz, R.F. (2010). Time-cost-quality trade-off software by using simplified genetic algorithm for typicalrepetitive construction projects. World Academy of Science Engineering and Technology, 61(1), 312-321.
Azaron, A., Perkgoz, C., Sakawa, M. (2005). A genetic algorithm approach for the time-cost trade-off in PERT networks. Applied Mathematics and Computation, 168(1), 1317–1339.
Ebrahimnezhad, S., Ahmadi, V., Javanshir, H. (2013). Time-cost-quality trade-off in a CPM network using fuzzy logic and genetic algorithm, International Journal of Industrial Engineering & Production Management, 24(3), 361-376.
El-Rayes, K., Kandil, A. (2005). Time-cost-quality trade-offanalysisforhighwayconstruction, Journal Of Computing in Civil Engineering, 131(4), 477-486.
Feng, C. (1997). Using GA to solve construction time cost trade off problem. Journal Of Computing in Civil Engineering, 11(3), 184-189.
Feng, C.W., Liu, L., Burns, S.A. (2000). Stochastic construction time-cost trade-off analysis. Journal Of Computing in Civil Engineering. 14(2), 117-126.
Fondahel, J.W. (1961). A non-computer approach to the critical path method for the construction industry Technical Report, Department of Civil Engineering, The construction Institute, Stanford University.
Iranmanesh, H., Skandari, M.R., Allahverdilloo, M. (2008). Finding pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling, International Journal of Computer and Information Engineering. 2(2), 118-122.
Leu, L., Burns S., & Feng C. (2005). Construction time- cost trade-off analysis using LP/IP hybrid model, Journal Of Construction Engineering Management, 121(4), 446-454.
Moselhi, O. (1993). Schedule compression using the direct stiffness method, Canadian Journal Civil Engineering, 20(1), 65-72.
Mungle, S., Benyoucef, L., Son, Y. J., & Tiwari, M. K. (2013). A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project. Engineering Applications of  Artificial Intelligence, 26(8), 1953-1966.
Pagnoni, A. (1990). Project engineering: computer oriented planning and operational decision making, Springer, Berlin.
Patterson, J.H., Huber, D.(1974). A horizon varying, zeroone approach to project scheduling, ManagementScience J., 20(6), 990-998.
Simens, N. (1971). A simple CPM time cost trade off algorithm, Management Science J., 17(6), 354-363.