Abdel Razek, R.H., Diab, A.M., Hafez, S.M., Aziz, R.F. (2010). Time-cost-quality trade-off software by using simplified genetic algorithm for typicalrepetitive construction projects. World Academy of Science Engineering and Technology, 61(1), 312-321.
Azaron, A., Perkgoz, C., Sakawa, M. (2005). A genetic algorithm approach for the time-cost trade-off in PERT networks. Applied Mathematics and Computation, 168(1), 1317–1339.
Ebrahimnezhad, S., Ahmadi, V., Javanshir, H. (2013). Time-cost-quality trade-off in a CPM network using fuzzy logic and genetic algorithm, International Journal of Industrial Engineering & Production Management, 24(3), 361-376.
El-Rayes, K., Kandil, A. (2005). Time-cost-quality trade-offanalysisforhighwayconstruction, Journal Of Computing in Civil Engineering, 131(4), 477-486.
Feng, C. (1997). Using GA to solve construction time cost trade off problem. Journal Of Computing in Civil Engineering, 11(3), 184-189.
Feng, C.W., Liu, L., Burns, S.A. (2000). Stochastic construction time-cost trade-off analysis. Journal Of Computing in Civil Engineering. 14(2), 117-126.
Fondahel, J.W. (1961). A non-computer approach to the critical path method for the construction industry Technical Report, Department of Civil Engineering, The construction Institute, Stanford University.
Iranmanesh, H., Skandari, M.R., Allahverdilloo, M. (2008). Finding pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling, International Journal of Computer and Information Engineering. 2(2), 118-122.
Leu, L., Burns S., & Feng C. (2005). Construction time- cost trade-off analysis using LP/IP hybrid model, Journal Of Construction Engineering Management, 121(4), 446-454.
Moselhi, O. (1993). Schedule compression using the direct stiffness method, Canadian Journal Civil Engineering, 20(1), 65-72.
Mungle, S., Benyoucef, L., Son, Y. J., & Tiwari, M. K. (2013). A fuzzy clustering-based genetic algorithm approach for time–cost–quality trade-off problems: A case study of highway construction project. Engineering Applications of Artificial Intelligence, 26(8), 1953-1966.
Pagnoni, A. (1990). Project engineering: computer oriented planning and operational decision making, Springer, Berlin.
Patterson, J.H., Huber, D.(1974). A horizon varying, zeroone approach to project scheduling, ManagementScience J., 20(6), 990-998.
Simens, N. (1971). A simple CPM time cost trade off algorithm, Management Science J., 17(6), 354-363.